Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

After analysing and prioritising parts for further Assessment, Prototyping and Qualification, Expert Users can create a (preliminary) AM part Configuration for parts directly on the part detail page.

Starting with version 23.10, the part detail page features a new Production tab, only accessible for AM Expert users when a part enters the Qualification stage. For further details on how to configure your statuses and assign Status types, see here Defining statuses and workflows .

The Production tab and entire AM Part Configuration form is only accessible for Expert users.

The AM Part Configuration form allows users to select a parts required Manufacturing and Post Processing steps. Through our reworked and extended Am Database, Expert users have access to

  • 6 standardised AM technologies

  • more than 1200 AM Materials, mapped to their respective Technologies and Material Categories

  • 32 standardised Post Processings, partitioned into 4 groups and linked to their applicable Material Categories

The available fields to select an AM Part configuration are all connected, supporting auto-assignment and cascading filtering, allowing users to drill down on their desired AM Material.

\uD83D\uDCD8 Instructions

To drill-down on your needed AM Material, simply

  1. Select the desired AM Technology

    1. this filters all following dropdowns based on your selection and render the Post Processing section

  2. Select the desired Material Type, from the now filtered list of Material Types available

    1. this further filters the individual materials below

  3. Select your exact AM Material from the options provided

    1. For easier identification, the materials manufacturer is appended after the original material tradename

  4. Continue selecting your desired Post Processings in the dedicated Post Processing section below

Screen Recording 2023-09-29 at 10.35.50.mov

To quickly select your desired and already known AM Material, simply

  1. Jump directly into the Material field, search for the tradename or supplier and immediately assign the correct material

    1. this will result in Material type and Technology being assigned automatically (if only one technology matches the material.

  2. Continue selecting your desired Post Processings in the dedicated Post Processing section below

Screen Recording 2023-09-29 at 13.20.59.mov

Customisation

Our Database allows manual adding for custom database entries to our default list of materials, post processings and technologies, while the available list of material categories is fixed and unchangeable. Also technologies and materials can be deactivated to tailor the available options to reflect your organisations setup. To get further info on how to add custom database entries, see here AM Databases .

  • No labels