Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

August, 15th 2019 -

...

 This release includes a big update on Post-Processing worklists in the Agile MES

[Agile MES] Dynamic Worklists (BETA)

  • [B3-5989] - Move Parts to this day
  • [B3-5923] - Finishing a Job deletes some of the existing worklists
  • [B3-5928] - Setting a workstations processing time to 0 does not save
  • [B3-5997] - Distinguish scheduled sequence group (not arrived) from arrived sequence group
  • [B3-6002] - Delete a job that has started or finished
  • [B3-6003] - Delete a job that is finished and workstation is confirmed
  • [B3-5931] - Worklist confirmation not working
  • [B3-5990] - [FE] Confirm a worklist when parts not arrived
  • [B3-5384] - [Backend] Moving/Adding/Scrapping/Deleting Jobs should change derived sequence group allocation in Worklists
  • [B3-5385] - [Backend] Changing Worklist Workload should reassign sequence groups
  • [B3-5386] - [Backend] Sequence group status update: in progress/complete/scrapped/moved
  • [B3-5387] - [Backend] Sequence group should have an arrived time
  • [B3-5388] - [Backend] Refactor job to use sequence group
  • [B3-6000] - [FE][BE] Worklist colors

Bug

...


...

Worklists are used to display and track the production and post-processing activities and steps on your shop floor. The Agile MES will automatically generate a Dynamic Worklist for each station that requires post-processing. Since each part can have an individual workflow and set of requirements after printing, the worklists are essential to track the individual progress, the production steps and ensure an audit trail for each part.

Key Functionalities


Automatically Adjusting Worklists

Every time a Job is moved, added or rescheduled the Agile MES will automatically reschedule the part worklists based on the available capacity in your production schedule. In this beta release your parts are adjusted based on first-in-first-out. The full release will optimize your production schedule based on the target delivery date for each part.

It is now also possible to scrap or delete Jobs which will remove all the planned Worklists related to the job.

Image Added

Changing the Workload Capacity within a Worklist

By clicking on a worklist, processing operators can view all parts that are scheduled to be processed on a workstation each day. This workload can be changed by manually removing or adding parts to the worklist.

  • Operators/Engineers should remove parts if the workload includes more parts than they can process in a day.
  • Operators should add parts if they want to prioritize parts from other future worklists or know that they can handle more parts in a single day.

After adjusting the part workload the worklist can be confirmed and the parts will be marked as ready to be processed.

Image Added


Tracking and Documenting Progress using Worklists

Operators and engineers can document all progress on the worklist as they process parts. The Agile MES automatically tracks when a part arrived at a workstation so that you can compare the planned arrival and the actual arrival time of a part. A part can be set to the following statuses:

  • In Progress: The processing of a part has started
  • Complete: The processing of a part is successfully completed. The part is automatically marked as arrived in the following workstation’s worklist.
  • Moved to next day: The processing of the part has not started and the part is rescheduled for the next day.
  • Scrapped: During the processing, the part was damaged and needs to be reprinted. A new part sequence is automatically created to be scheduled for production.


Image Added

Other notable changes and fixes:

  •  [Checkout] - Editing Shipping address no longer returns to Home
  •  [Agile MES]: DoesNotExist: Worklist matching query does not exist .fixed
  • [B3-5856] - "user email includes" works for scripted pricing
  • [B3-5874] - Editing Shipping address returns to Home
  • [B3-5922] - [ [Agile MES]  Scheduling a Job automatically sets the sequence groups status to printing
  •  [B3-5927] - [Agile MES] Scheduling stops when reaching a workstep without a workstation assigned
  • [B3-5940] - [frontend] - fix the shared vuex common/user/actions
  • [B3-5953] - minor service panel bugs
  • [B3-5963] - Order CSS fixes
  • [B3-5964] - Language for serializers isn't correct
  • [B3-5991] - [FE] Loading Service Panel] Have the "send email" not selected if the "send email" option is not selected in the admin panel
  •  [Service Panel] "user email includes" now works for scripted pricing
  •  [Service Panel] minor service panel bugs fixed
  •  [User Panel] Order CSS fixes
  •  [User Panel] Re-introduced loading indication after clicking on buttons
  •  [B3-6020Basket] - Wall thickness analysis is applying now to every part uploaded
  •  [B3-6071] - [Basket] Improved stability and performance of material list loading
  •  [Frontend] Language for serializers isn't correct
  •  [Frontend] Fixed the shared vuex common/user/actions

New Feature

  • [B3-4733] - [Backend] Models & AbstractSalesTransactions
  • [B3-5778] - [Backend] Save basket as Request view
  • [B3-5947] - [EvalJS] Await JavaScript Promises

Task

  • [B3-5864] - [Backend] Move "Billing address required" Flag to Partner

Improvement

  • [B3-5364] - [Frontend] Refactor useNewCheckout usage in the service panel
  • [B3-5557] - [Frontend] Bring back the list of supported file formats.
  • [B3-5840] - Have the "send email" not selected if the "send email" option is not selected in the admin panel[B3-5982] - [FE]Frontend] Refactor billing address
  • [B3-6047] - [backend] Backend] Rename /request-for-quote/ to /requests-for-quote/

Other Notable Changes and Bugfixes 

...

  • [Backend] Move "Billing address required" Flag to Partner




If you are interested in testing our upcoming tools as early adopters or have any further questions, please feel free to contact our product team.

...