...
Similar to the jobs list, the individual part list columns can be hidden or shown to the user's preferences. The list of parts can be searched, columns can be freely arranged with drag&drop and can be used for filtering and sorting to quickly find the desired job. The parts list offers the following columns and data:
Column | Description | Filterable | Sortable |
---|---|---|---|
Thumbnail | Preview image of the part | - | - |
Part # | Service specific Part ID that is automatically set when an order is placed. The Part ID is a hyperlink that can be right-clicked and hereby open the part detail page in a new tab if desired. | - | yes |
Part Name | Name of the ordered part. If the name is not changed manually | - | yes |
Order # | Order ID associated with the ordered part. The Order ID is a hyperlink that can be right-clicked and hereby open the order detail page in a new tab if desired. | - | yes |
Order Status | Shows the order status of the order to which the part belongs. | yes | |
Order Title | Order title associated with the ordered part. | - | yes |
Company | Company associated with the user who placed the order. | - | yes |
Order Date | Date the order was placed. | yes | yes |
Due Date | Due date specified by the customer during order process. Shown as “Preferred Due Date” in the Basket. | - | yes |
Est. Finished Date | Calculated production finish date of a part. The estimated finish date is compared to the target date to give feedback on potential delays of the current production schedule. If all sequences of a part are scheduled then the Est. finish date is automatically calculated following the formula:
This date is automatically re-calculated if jobs or workflow steps are updated. The Est. Finished Date is not calculated if there is no job or the job is not scheduled. | - | yes |
Target Date | The Target Date describes when the production of a part is expected to be finished. Under certain conditions the date is calculated automatically - but it can always be overwritten or filled in manually. For the target date to be calculated automatically, the following needs to be true:
The calculation of the Target Date is according to this formula:
This date is not re-calculated if jobs or workflow steps are updated. | yes | yes |
Shipping Time | - | - | |
Material | Material requested for part production. | yes | yes |
Post-Processings | Post-processings chosen in the order process for this part. | yes | yes |
Technology | Production technology to be used for production of this part. Inherited directly from the chosen material. | yes | yes |
Box Volume | A parts box volume. Automatically calculated during the analysis of the 3D file after uploading. | - | yes |
Quantity | Parts quantity that needs to be produced. | - | yes |
Assignees | Employee assigned to this part. | yes | - |
To Schedule | Shows how many parts still need to be added to a print job and scheduled. Example: To Schedule = 3/5
Sequences are considered scheduled if
| - | yes |
Step | Parts current workflow step. Shows Mixed if multiple sequence groups are in different steps. | yes | yes |
Next Step | Upcoming workflow step according to the parts assigned workflow. | - | - |
Workflow | Workflow that is assigned to the part. | - | yes |
Part Requirements columns | If specified in the order process, part requirements are shown as an individual column each. | - | - |