Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Table of Contents
minLevel2
maxLevel2

Catalog

External Part Reference

In order to be able to find parts for ordering in an easier way, we introduced an external part reference field to store the par number, ID or URL referencing this part in a third-party system.

...

ERP

<Feature title>

<Feature description, include link to documentation if possible>

MES

<Feature title>

<Feature description, include link to documentation if possible>

Machine Connectivity

<Feature title>

<Feature description, include link to documentation if possible>

General improvements

Organization product options

We deprecated the possibility to override Material Names on a per-organization basis ("Organization Product Options"). For now this means that new Organization Product Options can not be added but existing ones stay intact.

...

We think that this change will make the software simpler to configure and expect a higher overall quality.

Technical improvements

<Feature title>

<Feature description, include link to documentation if possible>

Bug fixes

PLM

  • <Short and concise description>

ERP

  • We fixed a bug causing slow generation of production sheet .PDFs with parts containing Japanese characters.

  • We fixed a bug in the checkout, allowing users to proceed without checking terms & conditions.

MES

  • We fixed a bug causing the date-time-picker to error out after a user selects NOW having prior deleted the time input manually.

  • We change the unit representation of kilograms in our material inventory from KG to kg.

...