Manage your Production Schedule

In the Schedule view, jobs that have been created are displayed in a Gantt chart to help maintain clear Production Overview of print jobs and post-processing worklists. 

Creating Jobs

  1. Review your Production Timeline by Day/ Week/ Month

  2. Create new Jobs

    • Click on Add Job

    • Select from the predefined materials which can be loaded on the machine

      • This can be configured in the Workstation Settings

    • The Agile MES will provide automatically prioritized part recommendations for a new job

      • Based on the geometrical characteristics of submitted parts, their material and the build chamber size

      • The parts are also added to workflows which are connected to specific machines and post-processing stations

  • Add suggested parts or show all parts that are unscheduled in one-click

  • Set/Adjust Printing Time

    • Time Calculation is currently set manually but will be automated in the future

  • Add a Custom Job Name (if applicable)

    • e.g. some companies use Customer Names for Jobs

  • If you need to move a Job to a later time or to a printer with the same production material, that can be done using drag and drop

  • Adjust the Job Details

  • Click to adjust the Parts in the job or add new Parts which are unscheduled

  • Document Process Parameters from the schedule view by clicking on a title. The information will be linked to all parts that have been assigned to that job based on their Sequence ID.

  • Attach Documents, Instructions and Comments

    • Most often, this is used for Quality Assurance documents such as pictures of snapped parts, etc.

  • When the status of the Job is changed, it will be visible in a different color in the Scheduler

Material Batch Number in Job Detail

The Material Batch Number for cab also be set at the Job level. This is important for Quality Control, particularly to document powder used for parts against testing done in the lab.

Batch 3D Model download during job planning and in job detail

We want to make the experience of finding the right parts and scheduling a job easier. We made it possible to quickly access the 3D models during and after scheduling jobs. Try the following:

  1. Use our smart part suggestion to quickly find the parts that fit into the build chamber

  2. Download the suggested 3D Models 

  3. Nest the downloaded 3D models and slice

  4. Adjust the job if needed and save


Set Time Zone per Service Location

Production Planners can set the time zone of each production location independently. This is essential for scheduling parts at the right time while working in international teams and distributed manufacturing.

Each service can set a specific time zone based on its location.

The Production Schedule is then displayed in the selected time zone and jobs/worklists are saved in that timezone. This is important for managing target delivery dates and times when transferring work between locations.


Scrapping and Rescheduling Jobs

If an entire job has failed, we also added the functionality to scrap the whole print job. Once a job has been scrapped you can easily reschedule it. On the Part level, the failed sequences are also scrapped and new ones are created for the rescheduled job.

  1. Go to Job detail

  2. Update the status to Failed

  3. In the Job detail the scheduled parts move to the status: `scrapped`, however the current status of the part detail doesn't change. 

  4. In part detail, the sequences of the parts are scrapped according to the workflow described above. 

  5. The job can be easily rescheduled. 

Reserved Times

It is now possible to reserve time slots in the schedule. This allows you to account for any time in which a workstation can not operate, such as maintenance, customer visits or research projects. Simply add a new reserved time and give it the name you want.

To configure a reserved time slot you can either:

  1. Click anywhere in the schedule and select the type: reserved time or

  2. go to Settings > Workstations > Reserved Time and configure a new reserved time for the selected workstation.


Comments for Jobs

It is now possible to add comments for Jobs. This allows printing services to collaborate internally to discuss and document details on the job. To add comments

  1. Go to Service Panel > Schedule

  2. Click on Job to access the Job detail 

  3. Enter a comment and click save. 